In Short

Yes, in most cases. A subbie should hold cover in their own name, usually public liability and workers compensation. As the business engaging them, pass your contract's requirements down, keep the limits fair to the work, and check a certificate of currency with you named before they start.

Key Points

  • Your client's insurance requirements need to pass down to every subbie.
  • Set limits by the subbie's scope of work, not by copying every number.
  • Ask for a certificate of currency with your business noted as an interested party.
  • Check the occupation and endorsements match the work you engaged them for.
  • Use a written subcontractor onboarding process and agreement.
  • Bring the tender and draft contract to your broker before you sign.
Jump To A Section

Yes. In most cases subcontractors need their own insurance, usually public liability and workers compensation, and your head contract sets the minimum. When you bring a subbie (a subcontractor) onto a job, their insurance becomes part of your risk: if they cause injury or damage and their cover doesn't respond, the claim can land on you, your client and the project. Paul, our broker, sees this gap more than any other when a site contract lands on his desk.

What Cover a Subcontractor Should Hold

A subcontractor should hold cover in their own name to work on your job. That usually means public liability insurance, which pays when their work injures someone or damages property, and subcontractor workers compensation if they employ staff. Larger jobs often ask for more, set out in the head contract, the main agreement between you and your client.

If you are the subcontractor and want to know what to carry, start with our guide to contractor insurance. The rest of this guide is written for the business engaging them: a head contractor, a scaffolding company or anyone who brings other trades onto a site.

Pass Your Client's Requirements Down to Subcontractors

The biggest gap Paul sees starts with the head contract. Your client sets insurance requirements and indemnities, which are promises to cover certain losses. Those obligations need to cascade down to every subcontractor working under you. If they stop with you, you carry promises your subbies never made.

Paul Cohalan of High Risk Cover answering questions about subcontractor cover in a recording studio

Read the insurance clause in your contract, then write the same requirements into every subcontract that touches the work.

Keep Subcontractor Limits Fair to the Work

Cascading the requirements doesn't mean copying every number. Paul puts it this way: "You don't want just a single one-man band plumber to go and have 50 mil liability. So it's about being fair and reasonable."

Set the limit by the scope of work, the activities the subbie was engaged for and the industry. Transport, mining, construction, development, scaffolding, security and labour hire all look different here. Labour hire, for example, has little subcontracting. Scaffolding has a lot.

What One Uninsured Subbie Can Cost

Paul has seen it end a business: "A lot of people go out and they engage the ABN or the Pty Ltd one-man band. It's really high risk. I actually had a company shut down because they engaged a one-man band, and the one-man band caused huge damage, and they couldn't subrogate because the right policy wasn't in place."

To subrogate is to recover money from the party who caused a loss. When an insurer pays a claim, it steps into your shoes and chases the subbie and their insurer. With no right policy in place there is nobody to recover from, so the loss stays with you.

For the one-man band the outcome can be worse. A claim of $50,000 or $100,000 that their insurer doesn't pick up becomes a personal debt, and most sole traders don't have that money sitting in the bank.

Ask Subcontractors for a Certificate of Currency

A certificate of currency is a one-page document from the insurer or broker showing that a policy is in force on a given date. Paul's advice is to ask every subcontractor for one, with your business noted as an interested party, meaning your business is recorded on the subcontractor's policy, and to check it before they start.

A current certificate lets you check:

  • The date it was issued, so you know the cover was in force when the subbie started.
  • The occupation on the policy matches the work you engaged them for.
  • The endorsements, which are written changes added to a policy.
  • The contractual obligations you asked for are actually in place.

A certificate that lists the wrong occupation is a warning sign. A policy written for a different trade may not respond to a claim from your job.

Talk to a broker about public liability insurance.

1300 477 662

Build a Subcontractor Onboarding Process

You induct a new employee before they start work. Paul says a subcontractor deserves the same: a written onboarding process, a subcontractor agreement your lawyer has reviewed and a clear list of what you require. He gives this example of the list:

  • Public liability at the limit your contract needs, for example $20 million.
  • Workers compensation in place.
  • If the subbie is a company whose working director is on the tools, the director added to the workers compensation certificate.
  • Principal's indemnity, where the subbie's liability policy also covers you for claims arising from their work.
  • Waiver of subrogation, where the subbie's insurer agrees not to recover its payout from you, when your own client asks for it.

Small subcontractors who have mostly worked for local residential builders may never have been asked for these. Set them out as non-negotiables from the first conversation.

Principal's Indemnity and Waiver of Subrogation

Two terms in that list confuse most business owners, and head contracts use both. Principal's indemnity extends the subcontractor's liability policy to cover you, the principal who engaged them, for claims that come from their work. Without it, a claim from the subbie's work can be made against you and your own policy has to answer it.

A waiver of subrogation stops the subcontractor's insurer from recovering what it paid on a claim from you. Your client may require it in the head contract, and when they do, it needs to be on every subbie's policy too. Check both on the certificate of currency, because the endorsements listed there show whether they are in place.

Why Checking a Subbie's Cover Protects Them Too

Asking these questions isn't only about protecting your business. It is part of your duty of care to the people working under you. In Paul's words: "If these small subcontractors get hurt or they can't work, what happens? They don't put food on the table personally."

It comes back to you as well. "If he gets injured and can't replace his worker to keep working, it'll delay you. It'll affect your revenue and your KPIs and contractuals with your head client." One gap in a subbie's cover can hold up the whole job.

Bring the Subcontract to Your Broker Before You Sign

The best time to sort out a subbie's cover is before you commit to a tender. Bring your broker:

  • The tender and the draft contract.
  • The insurance requirements and indemnities it sets.
  • Your scope of work and the size of the project.
  • The start date and estimated completion date.
  • How many people you will have on site.
  • Your onboarding and induction process.

Then ask two questions: are you covered under your current policies, and what else do you need? Paul's warning: "Don't just use it as a quick two-minute and go. Yeah, I'm all covered, because that's not good enough as a business owner."

Your broker gives you the risk advice. You decide which covers to add and which risks your business can carry itself. Whatever you ask for is confirmed in writing, with the policies, endorsements and premiums. If your crews work at height, our scaffolding insurance page covers what those contracts usually ask for, and construction insurance explains who holds which policy on a project.

Public liability insurance
Paul Cohalan, insurance broker at High Risk Cover

Paul Cohalan

Insurance broker

Paul has been an insurance broker since 2016 and is ASIC authorised representative 001247918. He built his brokerage from zero to between 900 and 1,000 clients. Before broking he was a Navy fitter and ran iron ore transport at BHP and heavy haulage for Roy Hill.

More about Paul

Questions

Do subcontractors need their own insurance?

Usually, yes. Most head contracts require each subcontractor to hold its own public liability insurance, and workers compensation if it employs staff. Check your contract for the limits and any extra requirements, then pass them down in your subcontract.

What is a certificate of currency?

A certificate of currency is a one-page document from an insurer or broker showing that a policy is in force on a given date. It names the insured, the type of cover and the limits. Ask each subcontractor for one before they start.

What does principal's indemnity mean?

Principal's indemnity is a part of a subcontractor's liability policy that also covers the business that engaged them, called the principal, for claims arising from the subcontractor's work.

What is a waiver of subrogation?

A waiver of subrogation is an agreement that an insurer won't recover the money it paid on a claim from another party, such as the head contractor. Head contracts sometimes require subcontractors to have one on their policy.

More Guides

Talk To A Broker Today

Call us or send your details and one of our brokers will be in touch.

1300 477 662
1300 477 662Get A Quote